NEWS
Precautions before and after installation of china foshan stainless steel sink
1. Before installation
First open the package, take out the tank body and drainage components, and check whether the accessories of the china foshan stainless steel sink are complete. Then open the hole according to the opening method, and check whether the muffler block is degummed. If it is degummed, it should be attached in time. Check whether the sealing rings on both sides of the connecting pipe are missing, dislocated, damaged, etc., to avoid leakage after installation.
2. When installing
In order to prevent accidental damage to the surface of the faucet when installing the angle valve, it is recommended to cover the angle valve with a plastic bag before operating. When connecting the hot and cold water pipes, the way is to connect the hot water pipe at the left end and the cold water pipe at the right end. During the installation process, pay attention to the size of the tightening force. If the force is too large, it will easily damage the thread and cause the screw to loosen. If it is too small, it may cause water leakage due to insufficient sealing. Therefore, when the sink is installed, be sure to carefully check the overflow hole and filter basket for sealing.
3. After installation
When the china foshan stainless steel sink is installed, be sure to test the water. First open the water cover of the drain, then raise the drain hose to keep it in line with the mouth of the sink, and then fill the china foshan stainless steel sink with water to ensure that the drain pipe is also full of water, wait for 3 -5 minutes or so, check each connection for leaks. If water seepage is found, immediately rework and re-glue.
Related News
Possess many high-end stainless steel sinks with fashionable design, beautiful and practical, and fine workmanship
Message
Copyright 2021 HESHAN SHUNHE METAL PRODUCT CO.,LTD 粤ICP备16010972号-1 Powered by:300.cn